Project Overview
Semper Services supported mechanical infrastructure works as part of a fast-track commercial t out project. The project involved the installation of critical cooling infrastructure and associated mechanical systems designed to support the building’s operational performance and environmental control.
Scope of Works
Installation of 504 fan coil units (FCUs)
Installation of critical chilled water system
Services Equipment Room (SER) on every floor
Critical cooling riser systems and lateral pipework
Prefabricated mechanical pipework systems
Installation of roof-level air source dry coolers
Solution / Delivery
The project was delivered within a fast-track programme, requiring ecient coordination.
Prefabrication and just-in-time deliveries
Sequenced riser works and coordinated access
QA inspections supporting commissioning readiness
Outcome
The completed installation provides critical cooling infrastructure supporting the building’s operational requirements. This project demonstrates Semper’s ability to deliver mechanical infrastructure within demanding commercial t out programmes while maintaining high standards of quality.
Project Challenges
Compressed programme and multi-trade interfaces
Logistics and material ow in a constrained site
Safe installation and lifting for roof plant
Services Provided
Mechanical Installation
Prefabrication
Critical Cooling
SER Installation
Project Coordination