Project Overview
We completed the replacement and refurbishment of the steel riser system within a medium-rise residential development, enhancing the integrity and efficiency of the building's services infrastructure. This complex gas infrastructure project required precise coordination to execute critical upgrades within occupied residential environments, ensuring safety and compliance throughout.
Scope of Works
Installation of 504 fan coil units (FCUs)
Installation of critical chilled water system
Services Equipment Room (SER) on every floor
Critical cooling riser systems and lateral pipework
Prefabricated mechanical pipework systems
Installation of roof-level air source dry coolers
Solution / Delivery
xecuted through a highly systematic approach prioritising resident safety and minimal disruption: -
Installation of specialised scaffolding towers for external access
Phased riser replacement strategy to minimise downtime
Sequenced riser works and coordinated access
QA inspections supporting commissioning readiness
Outcome
The project delivered a reconjured, high-performance workspace that perfectly balances open-plan collaboration with the client's requirement for private meeting spaces. The integration of bespoke acoustic solutions and upgraded mechanical services ensures a premium working environment consistent with the bank's corporate standards.
Project Challenges
Compressed programme and multi-trade interfaces
Logistics and material ow in a constrained site
Safe installation and lifting for roof plant
Services Provided
Mechanical Installation
Prefabrication
Critical Cooling
SER Installation
Project Coordination