Residential / Gas Infrastructure

Within an occupied residential building in Camden, existing steel gas risers were replaced alongside internal pipework modifications and meter alterations. The programme included riser installation, meter relocation, MOB replacements, safe isolation procedures, testing, commissioning, and resident coordination throughout the works.

Within an occupied residential building in Camden, existing steel gas risers were replaced alongside internal pipework modifications and meter alterations. The programme included riser installation, meter relocation, MOB replacements, safe isolation procedures, testing, commissioning, and resident coordination throughout the works.

Steel Riser & Internal Works to Meter

Steel Riser & Internal Works to Meter

Residential / Gas Infrastructure

Within an occupied residential building in Camden, existing steel gas risers were replaced alongside internal pipework modifications and meter alterations. The programme included riser installation, meter relocation, MOB replacements, safe isolation procedures, testing, commissioning, and resident coordination throughout the works.

Project Overview

We completed the replacement and refurbishment of the steel riser system within a medium-rise residential development, enhancing the integrity and efficiency of the building's services infrastructure. This complex gas infrastructure project required precise coordination to execute critical upgrades within occupied residential environments, ensuring safety and compliance throughout.

Scope of Works

  • Installation of 504 fan coil units (FCUs)

  • Installation of critical chilled water system

  • Services Equipment Room (SER) on every floor

  • Critical cooling riser systems and lateral pipework

  • Prefabricated mechanical pipework systems

  • Installation of roof-level air source dry coolers

Solution / Delivery

xecuted through a highly systematic approach prioritising resident safety and minimal disruption: -

  • Installation of specialised scaffolding towers for external access

  • Phased riser replacement strategy to minimise downtime

  • Sequenced riser works and coordinated access

  • QA inspections supporting commissioning readiness

Outcome

The project delivered a reconjured, high-performance workspace that perfectly balances open-plan collaboration with the client's requirement for private meeting spaces. The integration of bespoke acoustic solutions and upgraded mechanical services ensures a premium working environment consistent with the bank's corporate standards.

Project Challenges

  • Compressed programme and multi-trade interfaces

  • Logistics and material ow in a constrained site

  • Safe installation and lifting for roof plant

Services Provided

  • Mechanical Installation

  • Prefabrication

  • Critical Cooling

  • SER Installation

  • Project Coordination